Saturday, February 25, 2012

Yesterday, we visited the Camp Robinson site.  During this visit we were able to measure and obtain data to add to our proposal.  We were only able to measure one of the three streams there.  Collecting data is a very time consuming job in these forested streams.  First, we as a team marked off 100m of the stream.  Then we divided the 100m into three transects.  Within these transects we took our measurements and data. While there, we measured width, depth, bank slope, and the lithology of the stream.  Looking forward to returning to finish up the other two streams there at Camp Robinson. 

1 comment: